{"id":3781,"date":"2021-05-21T12:48:23","date_gmt":"2021-05-21T16:48:23","guid":{"rendered":"https:\/\/www.powerservicesgroup.com\/?p=3781"},"modified":"2021-05-21T12:48:23","modified_gmt":"2021-05-21T16:48:23","slug":"alstom-stf-steam-turbine-a-inspection","status":"publish","type":"post","link":"https:\/\/www.powerservicesgroup.com\/2021\/05\/alstom-stf-steam-turbine-a-inspection\/","title":{"rendered":"Alstom STF Steam Turbine “A” Inspection"},"content":{"rendered":"
We recently completed another “A” Inspection on an Alstom STF Steam Turbine.\u00a0 \u00a0This inspection consisted of inspecting the valves, bearings, H2 seals, testing of the generator, an LP crawl through, as well as an HP\/IP borescope.\u00a0 Below is a photo of the T1 Bearing Assembly, in which the bearing was dimensionally inspected and clearances verified to be within OEM design criteria.<\/span><\/p>\n <\/p>\n We perform A, B, and C inspections on the STF fleet, and many of our team members are former Alstom personnel that have the knowledge required to successfully execute these projects.\u00a0 Please contact us<\/a><\/strong><\/span> for all of your STF steam turbine outage planning and execution<\/a><\/span><\/strong> needs.<\/span><\/p>\n <\/p>\n","protected":false},"excerpt":{"rendered":" We recently completed another “A” Inspection on an Alstom STF Steam Turbine.\u00a0 \u00a0This inspection consisted of inspecting the valves, bearings, H2 seals, testing of the generator, an LP crawl through, as well as an HP\/IP borescope.\u00a0 Below is a photo of the T1 Bearing Assembly, in which the bearing was dimensionally inspected and clearances verified […]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[14,32],"tags":[65,58,61,59,62,66,64,57,60,63],"class_list":["post-3781","post","type-post","status-publish","format-standard","hentry","category-news","category-steam-turbine-tips","tag-a-inspection","tag-alstom","tag-alstom-steam","tag-alstom-stf","tag-alstom-turbine","tag-b-inspection","tag-c-inspection","tag-stf","tag-stf-steam","tag-stf-turbine"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/3781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/comments?post=3781"}],"version-history":[{"count":3,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/3781\/revisions"}],"predecessor-version":[{"id":3785,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/3781\/revisions\/3785"}],"wp:attachment":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/media?parent=3781"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/categories?post=3781"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/tags?post=3781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}