{"id":3448,"date":"2021-01-29T14:18:40","date_gmt":"2021-01-29T19:18:40","guid":{"rendered":"https:\/\/www.powerservicesgroup.com\/?p=3448"},"modified":"2021-01-29T14:18:40","modified_gmt":"2021-01-29T19:18:40","slug":"looking-to-order-steam-turbine-valve-components","status":"publish","type":"post","link":"https:\/\/www.powerservicesgroup.com\/2021\/01\/looking-to-order-steam-turbine-valve-components\/","title":{"rendered":"Looking to order Steam Turbine Valve Components?"},"content":{"rendered":"

Contact us<\/a> today to learn how we can provide you with high quality\/low cost valve components<\/a> for your Steam Turbine.\u00a0 \u00a0We manufacture a variety of valve components<\/a> for various Steam Turbine OEM types for the fossil and nuclear industries<\/a>.<\/p>\n

Whether it be to replenish your stock or for an upcoming turbine outage need, we have a solution for you.\u00a0 We can also reverse engineer<\/a> and manufacture components through the simple process outlined below.<\/p>\n

 <\/p>\n

The Reverse Engineering Process<\/a><\/div>\n
<\/div>\n
\"\"<\/div>\n
    \n
  • Sample Received<\/strong>\u2013 Whether it\u2019s a stock item or an item made to order for a special application, the process begins with a new or used sample.<\/li>\n
  • Reverse Engineering<\/strong>\u00a0\u2013 After receiving your sample, we confirm all required properties using our state of the art equipment; properties such as dimensions, hardness, and material composition.<\/li>\n
  • Design<\/strong>\u00a0\u2013 From the reverse engineering data, a detailed CAD manufacturing drawing is created in accordance with international design standards.<\/li>\n
  • Price Estimate<\/strong> \u2013 A price estimate is provided to the customer for the finished part. Typically, savings are in the range of 15-30% under standard retail pricing. More savings can be realized as production quantities increase.<\/li>\n
  • Manufacture<\/strong> \u2013 Upon agreement on the design and price, we manufactures the part, keeping you updated on status along the way. After passing a stringent quality inspection, parts will ship immediately.<\/li>\n<\/ul>\n

    We look forward to developing a custom plan to help you improve quality and reduce the cost of your critical steam turbine valve components.<\/p>\n\n\n\n\n
    \"\"<\/td>\n\"\"<\/td>\n\"\"<\/td>\n<\/tr>\n
    \"\"<\/td>\n\"\"<\/td>\n\"\"<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

    Contact us today to learn how we can provide you with high quality\/low cost valve components for your Steam Turbine.\u00a0 \u00a0We manufacture a variety of valve components for various Steam Turbine OEM types for the fossil and nuclear industries. Whether it be to replenish your stock or for an upcoming turbine outage need, we have […]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[14,32],"tags":[279,86,277,119,278],"class_list":["post-3448","post","type-post","status-publish","format-standard","hentry","category-news","category-steam-turbine-tips","tag-turbine-valve-parts","tag-turbine-valves","tag-valve-components","tag-valve-part-manufacturing","tag-valve-parts"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/3448"}],"collection":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/comments?post=3448"}],"version-history":[{"count":8,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/3448\/revisions"}],"predecessor-version":[{"id":3841,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/3448\/revisions\/3841"}],"wp:attachment":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/media?parent=3448"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/categories?post=3448"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/tags?post=3448"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}