{"id":2709,"date":"2020-04-23T15:21:02","date_gmt":"2020-04-23T19:21:02","guid":{"rendered":"https:\/\/www.powerservicesgroup.com\/?p=2709"},"modified":"2020-04-23T15:21:02","modified_gmt":"2020-04-23T19:21:02","slug":"g-3-steam-turbine-major-inspection","status":"publish","type":"post","link":"https:\/\/www.powerservicesgroup.com\/2020\/04\/g-3-steam-turbine-major-inspection\/","title":{"rendered":"G-3 Steam Turbine Major Inspection"},"content":{"rendered":"
We recently executed a Major Inspection on a GE G-3 Steam Turbine rated over 750 MW for a major Utility company in the U.S.\u00a0 This type of project is long and detail-oriented. The attention to safety each and every day must be at the forefront of every project, but especially one of this magnitude. There are a lot of moving parts on the schedule throughout the outage, so continuous updates and excellent communication and documentation is required to keep the project on-schedule through completion. For this project we had an excellent project management team on-site, including the Technical Field Advisors, Project Coordinator, Turbine Mechanic Foreman, and Turbine Mechanics. The experience of the team on-site can make or break the success of an outage. We are fortunate to have great outage teams, and they did an excellent job completing this project safely, with high-quality, on-schedule, and on-budget. Nice job PSG team!<\/p>\n
<\/p>\n","protected":false},"excerpt":{"rendered":"
We recently executed a Major Inspection on a GE G-3 Steam Turbine rated over 750 MW for a major Utility company in the U.S.\u00a0 This type of project is long and detail-oriented. The attention to safety each and every day must be at the forefront of every project, but especially one of this magnitude. There […]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[14,32],"tags":[121,124,126,125,127,122,123,98],"class_list":["post-2709","post","type-post","status-publish","format-standard","hentry","category-news","category-steam-turbine-tips","tag-g3-steam-turbine","tag-g3-turbine","tag-g3-turbine-repair","tag-g3-turbine-services","tag-ge-g3","tag-ge-steam-turbine","tag-general-electric-steam-turbine","tag-steam-turbine-major"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/2709","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/comments?post=2709"}],"version-history":[{"count":4,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/2709\/revisions"}],"predecessor-version":[{"id":2716,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/2709\/revisions\/2716"}],"wp:attachment":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/media?parent=2709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/categories?post=2709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/tags?post=2709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}