{"id":2668,"date":"2020-04-16T13:33:01","date_gmt":"2020-04-16T17:33:01","guid":{"rendered":"https:\/\/www.powerservicesgroup.com\/?p=2668"},"modified":"2020-04-16T13:33:01","modified_gmt":"2020-04-16T17:33:01","slug":"steam-turbine-valve-inspections","status":"publish","type":"post","link":"https:\/\/www.powerservicesgroup.com\/2020\/04\/steam-turbine-valve-inspections\/","title":{"rendered":"Steam Turbine Valve Inspections"},"content":{"rendered":"

We recently performed work for a U.S. utility on one of their Main Stop Valves for a GE Steam Turbine.\u00a0 We can perform valve inspections on-site or in our dedicated steam turbine valve facility in Gainesville, Georgia.\u00a0 If the valves are inspected at our Gainesville facility we have the ability to make any necessary repairs, reverse engineer and manufacture components, as well as offer material upgrades for longer service life.\u00a0 We also have an in-house nitriding furnace that allows to control the schedule and provide quick turnarounds on any parts that require a nitrided surface.\u00a0 \u00a0We have full capabilities to provide our customers with a turnkey valve service and help extend the life of your steam turbine valves.<\/p>\n

\"\"<\/p>\n","protected":false},"excerpt":{"rendered":"

We recently performed work for a U.S. utility on one of their Main Stop Valves for a GE Steam Turbine.\u00a0 We can perform valve inspections on-site or in our dedicated steam turbine valve facility in Gainesville, Georgia.\u00a0 If the valves are inspected at our Gainesville facility we have the ability to make any necessary repairs, […]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[14,32],"tags":[89,90,85,87,91,86,88],"class_list":["post-2668","post","type-post","status-publish","format-standard","hentry","category-news","category-steam-turbine-tips","tag-nitride","tag-reverse-engineer","tag-steam-turbine-valves","tag-steam-valves","tag-turbine-parts","tag-turbine-valves","tag-valve-inspection"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/2668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/comments?post=2668"}],"version-history":[{"count":3,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/2668\/revisions"}],"predecessor-version":[{"id":2672,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/posts\/2668\/revisions\/2672"}],"wp:attachment":[{"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/media?parent=2668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/categories?post=2668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.powerservicesgroup.com\/wp-json\/wp\/v2\/tags?post=2668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}